Free Tools

Free Plan

Free schedule tools

Four tools for schedule files. You do not sign in. You do not give a card.

  • Your files stay on your computer. All four run in your browser. Your file is never uploaded.
  • Why free? Teams pay for Pathizer Enterprise to review every update. These tools show how Pathizer reads a schedule.
  • P7 Free Scheduling

    Build and edit a schedule. P7 calculates the dates by critical path and shows them on a Gantt chart. It opens .XER and .XML files and saves .XER files.

    Runs in your browser. Your schedule stays on your computer.

  • Free Schedule Viewer

    Open a schedule file and read it. You see each activity under its WBS, a Gantt chart, the logic and the total float in the file.

  • Free Schedule Health Check

    Check how well one schedule is built. The tool runs the DCMA 14-Point checks one file can answer and gives a band from A to E.

  • Free Update Compare

    See what changed between two schedule updates. The tool lists added and deleted activities and relationships, and changes to dates, durations and float.

When one file is not enough

The free tools read one file at a time. They keep no history. Pathizer Enterprise reads every update of a project:

  • Every update of the project compared with the one before it
  • Delay and recovery measured from one update to the next
  • The Health Score, kept for every update
  • A drafted Management Brief and reports for your scheduler to review

Pathizer Enterprise costs $250 a month for up to 2,500 activities, with no charge per seat.