Pathizer vs. Manual XER Review
Same discipline. Every update pair.Evidence attached.
If your team already compares XER files by hand, you know the method works. You also know which part of it is reconciliation and which part is judgment. Pathizer calculates the reconciliation from the schedule, the same way on every update pair. Each finding traces back to the export it came from.
Try the free tools on an update pair your team already reviewed.
Task By Task
The update review, side by side.
Compare two XER updates
Export both files, diff activities in spreadsheets, and reconcile added, deleted, and modified rows by hand.
The engine compares every update pair automatically: activities, relationships, durations, and constraints.
Trace float erosion to paths
Chase total float activity by activity and rebuild the float paths that matter from memory and filters.
Float movement is mapped to phase and float paths on every update, with erosion flagged before it hits zero.
Identify what drove the movement
Correlate logic edits, duration changes, and progress by inspection, and hope nothing was missed.
Driver attribution ranks the activities and logic edits that carried the movement, in calendar days.
Separate progress from revisions
Manually distinguish what the work did from what the scheduler changed: the hardest call in any review.
Half-Step Analysis makes the split explicit: progress-related impacts versus schedule revisions, update by update.
Assemble evidence for review
Screenshot, annotate, and file the backup by hand so conclusions can be defended later.
Each finding traces back to the export it came from, so the evidence is already in place when you review it.
Write the executive narrative
Draft the update story from scratch for the owner meeting, every single cycle.
Pathizer drafts the narrative from the schedule record, with each statement tied to the movement it describes. Your team edits and owns the language.
Repeat next data date
Start over. Quality depends on who does the review and how much time they have that week.
The same methodology runs on every update and every project. The same inputs give the same result, and each step can be inspected.
Time for one update of 2,500 activities
- By hand
- About 20 hours
- With Pathizer
- About 6 hours
- Time back
- About 14 hours
How we estimate this
- By hand: about 20 hours for one update of 2,500 activities. That time includes progress entry, fragnets, health fixes, the review meeting and the reports.
- With Pathizer: about 6 hours. The field enters progress once, and Pathizer files the reports and the delay analysis in a median of 21 minutes (35 timed runs). The reports are the same every update.
- Your scheduler still runs the review meeting, adds the fragnets and fixes the health findings.
- Time grows with schedule size: each time the activities double, an update takes about 4 hours more.
On every update pair the engine lists the added, deleted and modified activities, the relationship, duration and constraint edits, and the float each one moved. Your team reviews those findings and decides what they mean.
What Stays Yours
Pathizer replaces the grind, not the judgment.
- Your scheduling workflow, read from the XER exports you already produce
- Your professional judgment, which the findings support and do not replace
- Your evidence standard, with every number traced back to the export it came from
Each finding traces back to the schedule export it came from.
When the update history cannot tie a day of movement to a party, Pathizer leaves that day unattributed. It does not split the day pro rata or round it into the largest share.
Put it against your last manual review.
Load the same update pair your team already compared and check the plain differences, free, in your browser.