Pathizer for Owners & Developers

Know why the date moved before you fund the recovery.

Your contractor's update says the milestone slipped and the recovery plan will fix it. Pathizer reads the same schedule updates and shows which party's activities drove each day of movement, in calendar days. It leaves unattributed what the record cannot support.

Open your latest schedule update. Add last month's to see what changed. No account or card.

Download Sample Update Report Made by Pathizer from a fictional sample project.

Behind Pathizer

Over a decade in project controls across a $3.5B+ portfolio at ENR 400 firms: residential, military, entertainment, healthcare, commercial, airport and data center work.

The Monthly Update

What each step of the monthly update gives an owner or developer.

Every month the schedule goes through the same five steps. Each one leaves a record you can read for yourself, before the owner meeting and before anyone asks you to fund a recovery.

  1. Progress Entry

    The field team enters actual dates and remaining durations in the Schedule Updater. Progress comes from the same record the schedule is built on, not from a slide.

  2. Add Fragnets

    Each time impact goes in as its own fragnet, in the period it happened. A claimed delay has a date, a place in the logic and a party.

  3. Health Check

    The update is scored with the Health Score and the DCMA 14-point checks before it is published. Hard constraints and open ends show before the meeting, not after it.

  4. Prepare for Review Meeting

    The meeting walks the float paths into each phase and turnover milestone, so a recovery plan is tested against the logic, not the narrative.

  5. Reporting

    On Publish, Pathizer writes the narrative, files the reports and runs the delay analysis. Each month's record is kept beside the last.

How the update cycle works

The Problem, In Your Terms

Reading a contractor's update without rebuilding it.

The update narrative comes from the party being measured.

Pathizer compares the prior and current XER. It lists the logic edits and duration changes between them, with the float each one moved, before anyone argues about why.

Recovery plans are hard to pressure-test in an owner meeting.

Half-Step Analysis splits each update's movement into what progress did and what the revised logic and durations did. A recovery that exists only in the re-forecast shows up as one.

If it becomes a dispute, the story has to be rebuilt from scratch.

Each finding traces back to the export it came from, starting with the first update. The record you review each month is the same record you would hand counsel.

What This Looks Like

Why the date moved, on one chart.

The Milestone Tracker plots total float for each phase from the baseline through seven updates. You can see where float went negative and which phase carried the slip before the recovery conversation starts.

Milestone Tracker

Phase APhase BPhase CPhase D
TOTAL FLOATTIME-20-100+10BLUD01UD02UD03UD04UD05UD06UD07zero floatPhase A +11Phase B +6Phase C -18Phase D -21

Illustrative analysis. Your results come from your own XER updates.

What You Walk Out With

What comes out of each update.

Start with one schedule you already have questions about.

How the monthly update works
  • Independent read of every schedule update
  • Delay and recovery quantified in calendar days
  • Float and movement at each phase and turnover milestone
  • Evidence ledger tied to the schedule record
  • A drafted executive narrative for your team to edit

Questions

Questions owners and developers ask.

Can an owner review a contractor's schedule update without a scheduler on staff?

Pathizer compares the contractor's update with the prior one. It lists the logic edits, duration changes and float movement between them, with the activities behind each one. Your team still decides what to accept. Pathizer shows the record each decision rests on.

What file does Pathizer need from the contractor?

The schedule update as a .XER file. .XML and SDEF files are read too. Keep sending each month's file and the history builds itself, from the first update on.

How are delays by the architect or engineer handled?

Design work by the architect and the engineers rolls up to the Owner party by default. Architect and Engineering show as detail rows under it. This is the default because most contracts make design delay the owner's risk. A project whose contract makes them parties of their own can set that in Analysis Setup.

Why track float at each phase milestone and not only the project finish?

A project finish can hold steady while one phase goes negative and another gains float. Tracking each phase and turnover milestone shows which commitment is at risk, update by update.

Can I measure a phase against a date that is not in the schedule?

Yes. A phase milestone's target can be set in Pathizer, as a fixed date or as another milestone's target. You do not edit the schedule files your contractor issued.

Is a Pathizer finding a decision on who is at fault?

No. Pathizer attributes a day only where the schedule record supports it and leaves the rest unattributed. Each finding traces back to the export it came from. Entitlement and fault stay with your team and your counsel.

See it on your own schedule.

Open your latest schedule update. Add last month's to see what changed. The free tools need no account.