The update history has to be rebuilt by hand before any method can run.
Upload the historical XER set and Pathizer builds the movement record update by update, showing what changed and on which paths.
Pathizer for Claims & Forensic Consultants
Pathizer runs windows in the manner of AACE 29R-03 MIP 3.7, 3.4 and 3.3 across the schedule update history. Half-Step Analysis splits each window's progress from its re-forecast. Each attributed day traces back to the export it came from, and days the record cannot support stay unattributed.
Tell us about the job. We reply by email to set up time, or call if you leave a number.
Download Sample Update Report Made by Pathizer from a fictional sample project.
Behind Pathizer
Over a decade in project controls across a $3.5B+ portfolio at ENR 400 firms: residential, military, entertainment, healthcare, commercial, airport and data center work.
The Monthly Update
When a project ran its updates in Pathizer, the forensic record already exists. Each update is kept with its data date. Each time impact is entered in its period. Each published file is analysed when it arrives. When it did not, you upload the update history and Pathizer builds the same record from it.
Progress Entry
Progress is entered against the schedule, with the person and the time on each edit in the Change Log.
Add Fragnets
Time impacts go in as fragnets in the period they happened, which keeps a contemporaneous record of when each one was known.
Health Check
Each update is scored before it is published, so a file's quality is on record at the time it was issued.
Prepare for Review Meeting
The review meeting is held on the float paths that were current that month.
Reporting
Each published update is kept, never edited, and analysed when it arrives. The delay reports are filed beside it.
The Problem, In Your Terms
The update history has to be rebuilt by hand before any method can run.
Upload the historical XER set and Pathizer builds the movement record update by update, showing what changed and on which paths.
Progress impacts and schedule revisions blur together.
Half-Step Analysis separates what the progress did from what the revised logic and durations did in each window.
The other side's scheduler will test every number.
Each finding traces back to the export it came from, and each analyst election is recorded with the value applied. Before a method runs, a source validation report states what the record can support.
What This Looks Like
Each finding carries a reference to the update pair and the activity rows it came from, with progress impacts kept apart from schedule revisions.
Half-Step Changes separate what the work did from what the scheduler changed. Each reference names the update pair and the activity edit it came from.
Illustrative analysis. Your results come from your own XER updates.
What You Walk Out With
Supports professional analysis and review. It does not replace expert judgment.
How delay analysis worksQuestions
Runs in the manner of MIP 3.3 (as-is), MIP 3.4 (Half-Step) and MIP 3.7 (windows), plus a concurrent delay analysis. Each has its own evidence record. MIP 3.5 is a screening pass for modified or recreated updates, with no run of its own.
Removed work is never treated as a time impact. Its days pass to its driving successor as a Half-Step, so each window still reconciles to the phase milestone's float. They are listed in the Half-Step and Void Review for you to check.
Each finding names the update pair and the activity it came from, and each window adds up to the phase milestone's total float movement. Analyst elections are recorded with the value applied.
No. It supports professional analysis and review. It does not decide entitlement or causation, and it does not replace expert judgment.
Tell us about the job. We reply by email to set up a 30 minute review, or call if you leave a number.
Files in a signed-in Pathizer workspace are not used to train public AI models.