Separate progress impacts from schedule revisions between updates, for finish dates, milestones, critical path, delay and recovery.
Delay analysis
Load every schedule update on the job to see the days each phase lost or gained, update by update.
Method selection and causation stay with the analyst.
Delay analysis preview
24 calendar days later
Substantial Completion, Update 1 to Update 14, longest path
Where the days came from
Half-Step split
15 CD from progress
9 CD from plan revisions
Illustrative product preview. Your findings depend on your schedule record and analyst review.
Delay Review Problem
The reviewer has to show which path drove the finish in each window. They have to show how much movement came from progress and how much from revisions to the plan. They also have to show whether a recovery was completed work or a resequence. Pathizer calculates each from your XERs, with the activities behind it.
Focused Capabilities
Pathizer turns historical XER updates into a repeatable forensic review. For a case that needs more, Forensic Review is a premium, scoped engagement built on the same analysis.
Separate progress impacts from schedule revisions between updates, for finish dates, milestones, critical path, delay and recovery.
Trace how float, predecessor and successor relationships, logic ties and path movement changed across the schedule record.
Track float consumption by party in calendar days, first-come first-served absent contrary contract terms. This is the schedule side of a time extension request, a delay claim or an LD position.
Quantify delay, float erosion and driver attribution in the manner of the AACE 29R-03 Method Implementation Protocols, with each run's evidence record kept. Method selection and causation stay with the analyst.
Draft professional language on what changed, why it matters and which evidence supports it.
Separate real recovery from resequencing, compression, cosmetic forecast movement and downstream float loss.
Product Previews
Illustrative analysis. Your results come from your own XER updates.
The earliest window and the latest update share one timeline by WBS and activity, with the inserted fragnets drawn between them.
A window table lists the phase total-float variance and the fragnets that entered the evaluated path in each window.
Trace evaluated path nodes from project start through controlling activities to phase finish.
Trace the activities and trades driving phase movement.
Quantify trade-level schedule exposure before it becomes a claim.
Illustrative figures, priced at an assumed $20K per calendar day. In Pathizer you set the daily rate for each phase.
Forensic Review
| Category | With Pathizer | Manual assembly |
|---|---|---|
| Update history | Compare changes across uploaded updates in one workspace | Assemble and reconcile each update pair |
| Progress and revisions | Inspect Half-Step results and the source changes behind them | Separate progress effects from scheduler edits by hand |
| Evidence references | Follow source-linked findings back to the schedule record | Maintain references across files and workpapers |
| Narrative preparation | Review and edit a draft grounded in the analysis | Draft from comparison notes and supporting records |
| Professional judgment | The analyst retains these decisions, with recorded elections and inspectable outputs | Select methods, assess causation, and defend conclusions |
Time for one update of 2,500 activities
Delay Claim Builder logs delay events against the analyzed update history and drafts a narrative. Its figures are read from the analysis engine, not written by a model, and it prints under your organization logo. It does not read the contract.
Included with the Enterprise Plan
The same analysed schedule drives all three, so a delay you find in the update review is already in the delay analysis. Nothing is exported, re-imported or reconciled by hand.
The Enterprise Plan includes all of it in one organization subscription: the monthly update, the update review and delay analysis. See what the Enterprise Plan includes.
When the update history cannot tie a day of movement to a party, Pathizer leaves that day unattributed. It does not split the day pro rata or round it into the largest share.
Pricing
30-day pilot on your own projects: the monthly update, the reports and delay analysis included. No card to start, up to 10,000 activities.
Count the activities in a typical schedule file.
About 4,500 activities in total.
$500 / month
Scheduling cost saved
About $2,900 a month
About 36 hours back for your schedulers each month
No charge per seat. Delay analysis is included.
We estimate each scheduler can handle ~50,000 activities with Pathizer Enterprise.
Estimate only, before taxes or account adjustments. You see your exact price before you subscribe.
Each discount applies only to the activities inside its own band, not to your whole count.