Delay analysis

Which party's activities drove each day of delay,from the update history.

Load every schedule update on the job to see the days each phase lost or gained, update by update.

Method selection and causation stay with the analyst.

Delay analysis preview

24 calendar days later

Substantial Completion, Update 1 to Update 14, longest path

Evidence linked

Where the days came from

  • Steel erection sequenceSteel subcontractor12 CD
  • RFI 238 responseDesign team8 CD
  • Weather daysWeather calendar4 CD

Half-Step split

15 CD from progress

9 CD from plan revisions

Illustrative product preview. Your findings depend on your schedule record and analyst review.

Delay Review Problem

What a delay review has to establish from the update files.

The reviewer has to show which path drove the finish in each window. They have to show how much movement came from progress and how much from revisions to the plan. They also have to show whether a recovery was completed work or a resequence. Pathizer calculates each from your XERs, with the activities behind it.

Focused Capabilities

Built for delay review.

Pathizer turns historical XER updates into a repeatable forensic review. For a case that needs more, Forensic Review is a premium, scoped engagement built on the same analysis.

Half-Step Changes

Separate progress impacts from schedule revisions between updates, for finish dates, milestones, critical path, delay and recovery.

Float & Logic Analysis

Trace how float, predecessor and successor relationships, logic ties and path movement changed across the schedule record.

Continuous Float Ledger

Track float consumption by party in calendar days, first-come first-served absent contrary contract terms. This is the schedule side of a time extension request, a delay claim or an LD position.

AACE RP 29R-03 Method Suite

Quantify delay, float erosion and driver attribution in the manner of the AACE 29R-03 Method Implementation Protocols, with each run's evidence record kept. Method selection and causation stay with the analyst.

Recovery Quality Review

Separate real recovery from resequencing, compression, cosmetic forecast movement and downstream float loss.

Product Previews

See which window added the days and which path carried them.

Illustrative analysis. Your results come from your own XER updates.

Automated Window Analysis (TIA)

The earliest window and the latest update share one timeline by WBS and activity, with the inserted fragnets drawn between them.

ACTIVITY / WBSSTARTFINISHGANTT CHARTMARAPRMAYJUNBaselineMarJunImpactedMarJunActualMarJunUG MEPMarAprSlab PourMarMarErect SteelMarAprBlue = actualized / completedGreen = remainingAmber = fragnet

A window table lists the phase total-float variance and the fragnets that entered the evaluated path in each window.

Network Diagram

Trace evaluated path nodes from project start through controlling activities to phase finish.

Data DateStartImpactRecoveryPhaseEvaluated path to phase finishDelay branchSecondary path

Continuous Float Attribution

Trace the activities and trades driving phase movement.

A9000 Substantial Completion
ActivityTradeImpact
M5040 Electrical Rough-InElectrical-17 CD
I6020 Drywall, Tape and PaintInteriors+11 CD
T3020 Structural Steel ErectionSteel0 CD

Contractor Risk Exposure

Quantify trade-level schedule exposure before it becomes a claim.

TradeExposureFloat Impact
Steel Trade$360K-18 CD
Electrical Trade$220K-11 CD
Plumbing Trade$140K-7 CD

Illustrative figures, priced at an assumed $20K per calendar day. In Pathizer you set the daily rate for each phase.

Forensic Review

Manual assembly next to Pathizer, step by step.

CategoryWith PathizerManual assembly
Update historyCompare changes across uploaded updates in one workspaceAssemble and reconcile each update pair
Progress and revisionsInspect Half-Step results and the source changes behind themSeparate progress effects from scheduler edits by hand
Evidence referencesFollow source-linked findings back to the schedule recordMaintain references across files and workpapers
Narrative preparationReview and edit a draft grounded in the analysisDraft from comparison notes and supporting records
Professional judgmentThe analyst retains these decisions, with recorded elections and inspectable outputsSelect methods, assess causation, and defend conclusions

Time for one update of 2,500 activities

By hand
About 20 hours
With Pathizer
About 6 hours
Time back
About 14 hours
How we estimate this
  • By hand: about 20 hours for one update of 2,500 activities. That time includes progress entry, fragnets, health fixes, the review meeting and the reports.
  • With Pathizer: about 6 hours. The field enters progress once, and Pathizer files the reports and the delay analysis in a median of 21 minutes (35 timed runs). The reports are the same every update.
  • Your scheduler still runs the review meeting, adds the fragnets and fixes the health findings.
  • Time grows with schedule size: each time the activities double, an update takes about 4 hours more.

Delay Claim Builder logs delay events against the analyzed update history and drafts a narrative. Its figures are read from the analysis engine, not written by a model, and it prints under your organization logo. It does not read the contract.

Included with the Enterprise Plan

One subscription. Three kinds of work from one schedule.

The same analysed schedule drives all three, so a delay you find in the update review is already in the delay analysis. Nothing is exported, re-imported or reconciled by hand.

The Enterprise Plan includes all of it in one organization subscription: the monthly update, the update review and delay analysis. See what the Enterprise Plan includes.

Each finding traces back to the schedule export it came from.

When the update history cannot tie a day of movement to a party, Pathizer leaves that day unattributed. It does not split the day pro rata or round it into the largest share.

Pricing

Delay analysis starts with the schedule history.

30-day pilot on your own projects: the monthly update, the reports and delay analysis included. No card to start, up to 10,000 activities.

Tell us about your work

Count the activities in a typical schedule file.

About 4,500 activities in total.

Your monthly price (USD)

$500 / month

Per year
$6,000
at this size
Covers up to
5,000
activities

Scheduling cost saved

About $2,900 a month

About 36 hours back for your schedulers each month

How we estimate this
  • One update of 2,500 activities takes about 20 hours by hand and about 6 hours with Pathizer.
  • The hours include progress entry, fragnets, health fixes, the review meeting and the reports.
  • Time grows with schedule size: each time the activities double, an update takes about 4 hours more.
  • We price one hour at $80, the 90th percentile wage for project management specialists (US Bureau of Labor Statistics, 2025).
  • We count one update a month for each project. This is an estimate. Your numbers can be different.

No charge per seat. Delay analysis is included.

We estimate each scheduler can handle ~50,000 activities with Pathizer Enterprise.

Estimate only, before taxes or account adjustments. You see your exact price before you subscribe.

How the price is worked out
  • The price is $250 a month for every 2,500 activities.
  • Activities from all your projects are added into one count for your organization, then rounded up to whole blocks of 2,500.
  • Volume discounts (already in the price above):
    • The first 50,000 activities: the standard rate.
    • Activities above 50,000 up to 100,000: 10% off.
    • Activities above 100,000: 20% off.

    Each discount applies only to the activities inside its own band, not to your whole count.

  • Each project counts at its latest accepted schedule for 30 days after that upload. When your count goes up, the increase is charged right away, prorated for the rest of the billing period. When a project's 30 days end, it drops out and the difference is credited on your next invoice.
  • Above 1,000,000 activities, talk to our team for a quote.
  • How far back delay analysis can look depends on each project's accepted schedule history.