Pathizer for Scheduling Consultants & Project Controls

The update narrative and phase reports, drafted from one comparison of the prior and current XER.

You already compare XER files by hand. Pathizer runs that comparison the same way on every update pair and drafts the narrative for you to edit. The float math is calculated, and each finding traces back to the export it came from.

Open your latest schedule update. Add last month's to see what changed. No account or card.

Download Sample Update Report Made by Pathizer from a fictional sample project.

Behind Pathizer

Over a decade in project controls across a $3.5B+ portfolio at ENR 400 firms: residential, military, entertainment, healthcare, commercial, airport and data center work.

The Monthly Update

The scheduler runs the cycle. Pathizer does the repeat work.

The Flowchart holds the same five steps for every project, with a due date and a status for each one. You keep the judgment calls. The comparison, the checks and the reports are done the same way every month.

  1. Progress Entry

    The field team enters progress in the Schedule Updater. You get the updated .XER from the same place every month, not from a spreadsheet.

  2. Add Fragnets

    You build the period's fragnets in your own schedule or in P7. Your AI assistant can follow Pathizer's named procedures with you.

  3. Health Check

    Drop the file in the Health Check. It is scored with the Health Score, and the findings come back as a list you can fix and check again.

  4. Prepare for Review Meeting

    Run the review meeting on the Float Paths layout in P7, from the update you just checked.

  5. Reporting

    Publish it. Pathizer drafts the narrative, files the PDF reports and runs the delay analysis. Sign them off and send them, and the next period starts at Progress Entry.

How the update cycle works

The Problem, In Your Terms

The parts of the monthly update that eat a scheduler's week.

Manual XER comparison does not scale across a portfolio.

The engine compares each update pair the same way on every project, listing added and deleted activities, logic edits, duration changes and float movement.

Review quality depends on who did the review.

Every project gets the same Health Score and DCMA-14 checks and the same driver attribution, whoever runs the review.

Your name goes on the review, so every number has to be checkable.

The float math is calculated from the schedule. AI drafts the narrative wording only, and each finding traces back to the export it came from.

What This Looks Like

Every update pair, checked the same way.

Each update pair gets the same diagnostics. They include counts of added activities and half-step revisions, the edits that touched a phase path, and a Health Score.

Update-Pair Diagnostics

UD03 → UD04

529

Added Activities

Rows requiring review

47

Half-Step Revisions

Forecast edits

18

Path-Affecting

Evidence tied to phase paths

3

DCMA Checks Failed

Health Score (DCMA-14)

Health ScoreWatchDeteriorating, recovery signals
Confidence: High

Illustrative analysis. Your results come from your own XER updates.

What You Walk Out With

What comes out of each update.

Start with an update pair your team already reviewed.

How the monthly update works
  • Update-pair comparison on every project
  • Health Score and DCMA-14 checks on every update
  • Float paths and drivers for each phase milestone
  • A drafted narrative your team edits

Questions

Questions schedulers ask.

Which schedule files can Pathizer read?

.XER files, .XML files and SDEF files. Each update is kept with its own data date, one active file for each data date.

What does the Health Check do before I publish?

It scores the update with the Health Score, which includes the DCMA 14-point checks, against the updates before it. It lists the findings as facts, such as hard constraints and negative lags, and you decide what to fix.

Is the narrative written by AI?

The dates, float, drivers and day counts come from the schedule engine, not from a model. AI drafts the wording from those figures only. You read and edit the draft before it goes out.

Can my own AI assistant work with Pathizer?

Yes. Through the Pathizer connector, your AI assistant can read the Health Check findings, the narrative and the delay findings, and work in P7 with you. It acts with your account's permissions and asks before most changes. While it runs the update cycle you asked for, it marks each Flowchart step done itself.

See it on your own schedule.

Open your latest schedule update. Add last month's to see what changed. The free tools need no account.

Files in a signed-in Pathizer workspace are not used to train public AI models.