Compare each schedule update with the one before it.Then draft the narrative from what moved.

Pathizer lists what changed between the prior XER and the current one and runs the DCMA 14-point checks on the new one. It traces the float paths, added activities and logic changes behind the trend. The update narrative is drafted from that comparison for your scheduler to edit.

Open your latest schedule update. Add last month's to see what changed. No account or card.

Update Review preview

Understand what changed

Watch
Health Score
72
Update Trend
Watch
Narrative
Ready

Score drivers

Schedule health is deteriorating. Recovery activity is present, but logic reliability and phase confidence remain exposed.

Evidence-backed
Logic IntegrityAt Risk
Execution ReliabilityWatch
Phase ReliabilityAt Risk
Forecast StabilityWatch

Management Brief

This update shows partial recovery, but the improvement is not yet fully reliable. Float erosion remains concentrated around phase handoffs, and recent logic changes reduce confidence in the forecast.

Illustrative product preview. Your findings depend on your schedule record and analyst review.

In The Update Review

The schedule analytics behind each update review.

These tools are the schedule analytics of the update review. Every tool below reads the same analysed updates, so the score, the paths and the risks describe the same schedule. It is part of Pathizer Enterprise and is not sold separately.

Health Score (DCMA-14)

All fourteen DCMA checks on each update, from missing logic and hard constraints to CPLI and BEI. Each shows the value found and the target, rolled into a weighted score.

Health Score (DCMA-14) in detail
Float Paths

The evaluated float paths into each phase milestone, update by update, with the points where paths diverge and converge.

Float Paths in detail
Added Activities and Logic Changes

Activities inserted between adjacent updates, listed as insertions, and the duration, logic, calendar and constraint revisions flagged between the same two updates.

Added Activities and Logic Changes in detail
Risk Register (QAQC)

Active future risks derived from critical path, float erosion, consecutive slips and inserted logic. Each is scored on a 5x5 probability-impact matrix, with manual risks kept beside them.

Risk Register (QAQC) in detail
Monte Carlo

1,000 seeded iterations of a CPM forward pass over the activity network. The same inputs and seed reproduce the same finish-date distribution, and the seed ships with the run.

Monte Carlo in detail
Project Dashboard

The project's cycle step, Health Score and phase finishes against the baseline, then delay, recovery and overall schedule exposure. All of it is read from the completed analysis, not assembled by hand.

Project Dashboard in detail

Shared With The Monthly Update

Update Review and the drafted narrative are on the monthly update page.

Update Review compares the latest update with the prior one, and the Management Brief is drafted from that comparison for your scheduler to edit. The questions the review answers, a worked sample project and the score dimensions are set out once, on the monthly update page.

Focused Capabilities

Built around the controls questions that decide each update review.

Each surface below reads the same pair of updates, so the score, the diagnostics and the narrative agree with the comparison.

What changed

Update Review

Compares the latest update with the prior one and lists the activities added and deleted between them, with every logic and duration edit.

Float movement · Logic changes · Phase pressure · Update comparison

How healthy it is

Health Score

Runs the DCMA 14-point checks on the update and rolls them into a weighted score, showing the value found and the target for each check.

Logic integrity · Forecast stability · Phase reliability · Operational pressure

Why it changed

Pathizer Diagnostics

Names the activities behind float erosion and resequencing, and flags a recovery that exists only in the re-forecast.

Deterioration · Recovery quality · Change awareness · Risk drivers

How to explain it

Management Brief

Drafts the update narrative from the same comparison. Your scheduler edits it before it goes to the owner.

Executive summary · Evidence citations · Review language · Meeting prep

Contextual Schedule Copilot

Pathizer AI explains schedule evidence inside the workflow.

Pathizer AI is grounded in actual XER schedule evidence, phase drivers, update review findings, float path context, and window analysis artifacts. It supports schedule review without replacing scheduler, consultant, or legal judgment.

Update review workflow

From the update file to the drafted review.

  1. 01

    Upload the prior and current XER

  2. 02

    List the float erosion and logic edits between them

  3. 03

    Run the Health Score and DCMA-14 checks

  4. 04

    Name the drivers and check whether a recovery was worked

  5. 05

    Draft the narrative for your scheduler to edit

  6. 06

    Take the reviewed narrative into the owner meeting

From Update QA To Executive Reporting

Where it fits in a controls review.

  • Monthly update review
  • Executive reporting
  • Owner and contractor progress meetings
  • Recovery-plan scrutiny
  • Update QA before a delay review
  • Internal project controls review
  • Phase-readiness review
  • Schedule health monitoring
  • Update narrative preparation
  • Delay-risk escalation

What the update review does

What it does for schedulers and project controls teams.

The comparison is done before the review

Update movement, logic changes, float shifts and recovery claims are listed for each update pair when the review starts.

A read on what changed before the meeting

Walk into owner, contractor, and executive meetings with a clear read on what changed and why.

The same review on every project

Schedule health, deterioration, recovery and risk are explained the same way across projects.

Float erosion in the update where it started

See float erosion at a phase milestone in the update where it started.

Narratives tied to the schedule

Each statement in the review narrative points back to the activity edits it describes.

Before the meeting

Walk in knowing what changed and what to say.

Update Review, Health Score and the drafted narrative all read the same pair of XER files. The scheduler and the project executive start the meeting from the same numbers.

Start a 30-Day Pilot
Small project-controls team reviewing progress in a project office

Included with the Enterprise Plan

One subscription. Three kinds of work from one schedule.

The same analysed schedule drives all three, so a delay you find in the update review is already in the delay analysis. Nothing is exported, re-imported or reconciled by hand.

The Enterprise Plan includes all of it in one organization subscription: the monthly update, the update review and delay analysis. See what the Enterprise Plan includes.

Outputs In Plain English

What the review answers for each update.

  1. 01What changed since the last update
  2. 02Whether the update is stable, recovering, or deteriorating
  3. 03Which score drivers need attention
  4. 04Which diagnostics explain the trend
  5. 05What leadership should say about the update

Each finding traces back to the schedule export it came from.

When the update history cannot tie a day of movement to a party, Pathizer leaves that day unattributed. It does not split the day pro rata or round it into the largest share.

Pricing

Open your latest schedule update.

Add last month's to see what changed. The free tools need no account. Health Score, the drafted narrative and the full Update Review run in your project workspace.

Included In Every Workspace

Every Pathizer workspace reads the same schedule record, so these ship with the product. They are not add-ons.

  • XER schedule analysis
  • Delay and recovery tracking
  • Movement at each phase milestone
  • Float paths to each phase milestone
  • Half-Step revision detection
  • Network Diagram visualization
  • Executive schedule narratives
  • Findings traced to the export they came from
  • AI-assisted schedule review